Commissioning day is your last easy chance to catch problems. Use this list.
Image: Dornbirn-Forachstrasse 74-Subconstruction photovoltaic-04ASD by Asurnipal, CC BY-SA 4.0, via Wikimedia Commons.
The day your installer finishes is the most important day of solar installation in Raipur from a quality point of view. Use this checklist to verify the work before signing off.
Quick answer: inspect structure, wiring, earthing, labels, inverter and monitoring, then collect all documents before paying the last instalment.
| Document | Check |
|---|---|
| Commissioning report | Signed and dated |
| Module and inverter warranties | Serial numbers match |
| Invoice with GST | Names equipment |
| Net metering approval | Meter fitted and recording |
| Subsidy application acknowledgement | Status visible on portal |
| Contact for service | Named person and number |
| Test | Typical expectation |
|---|---|
| Open-circuit voltage per string | Matches design within tolerance |
| Insulation resistance | High, per standard |
| Earth resistance | Low, as specified |
| Inverter start and grid sync | Normal, no fault codes |
| Generation during the visit | Consistent with sun and capacity |
You do not need to interpret the numbers yourself; ask that they be recorded in the commissioning report and signed.
Tie the final instalment to documents and net metering. If the installer is waiting on the utility for the meter, agree in writing what will be paid now and what later. Never hand over the final payment before you hold the warranty cards.
Within the first month, compare generation with the estimate, confirm exports in the bill and note any error messages. Report problems in writing. See solar installation in Raipur for what a good process looks like.
Inspect, then sign. For a method to compare providers, see how to build your own list of the top 10 solar companies in Raipur. To act on it, book a survey with a solar company in Raipur and ask for the solar subsidy in Raipur to be worked out in writing. Compare firms with the best solar company in Raipur questions, check PM Surya Ghar Yojna in Raipur for the slabs and see how solar installation in Raipur works. Our solar in Raipur overview and solar Raipur guide add local detail, and the blog has more.
The owner, the installer's engineer and ideally a family member.
An hour or two for a home system.
Note it in writing and agree a date to fix it before final payment.
Commissioning report, warranties, invoices and the net meter approval.
After net metering is working and documents are handed over.
Visit C-29, Sector 3, Devendra Nagar, Raipur, Chhattisgarh 492001, call 083051 31420 or send your details online for a free survey and a written quotation, with the subsidy worked out. Our solar installation in Raipur team replies the same working day.
Looking for the best solar company in Raipur? See how solar in Raipur works, check the solar Raipur locality guide and book solar installation in Raipur with a trusted solar company in Raipur. Our checklist for the best solar company in Raipur shows what to ask. For PM Surya Ghar Yojna in Raipur and solar subsidy in Raipur, we manage registration, approvals and the claim. Quick links: best solar in Raipur, best solar company in Chhattisgarh, solar subsidy in Raipur, solar panel price in Raipur and solar street light in Raipur. Browse every article on the solar blog, or see our solar services.
Reports, warranties and photographs included.